Al Asab is the leading international service provider to the oil and gas production and processing industry.

Our Corporate Office:

Al Asab has executed a large number of projects since its inception. A lot of them for oil and gas sector of the UAE. Out of the total projects some stellar mentions are as below.

Core Competencies

Being a one-stop turn-key EPC solution provider, Al Asab boasts of its capabilities in broadly two sectors which are Oil & Gas and the Civil & Infrastructure. Beginning from engineering and up to commissioning, Al Asab caters to end-to-end services to its clients.

Al Asab’s services have their foundations around Al Asab’s core competencies:

Engineering Engineering
Procurement Procurement
Construction Construction
Commissioning Commissioning
Project Management Project Management
  • Project Management

    Assuring all systems, components are designed, installed, tested, operated, and maintained according to the operational requirements

  • Engineering #1

    Al Asab engineers plan, design, monitor and inspect systems to make buildings comfortable, functional, efficient and safe

  • Procurement #2

    Al Asab project managers secure all planning, scheduling, building, resources and reporting associated with construction projects

  • Construcion #3

    Al Asab - covering all three sectors of construction: buildings, infrastructure and industrial

  • Commissioning #4

    Top-notch procurement - securing all the goods and services to bring the construction project to completion in time

Oil & Gas Key Projects

Project description
EPC for Rumaitha Thamama Zone B Phase III Expansion Development
Client:
ADCO
Scope Of Works:
EPC for 2 new Clusters including 11 wells, upgradation of 5 Co2 affected wells and 27 km of INCONEL Claded pipeline for ADNOC Onshore in NEB fields.
Year of award/completion:
Dec 2021
Current Status:
ONGOING
Project description
EPC Call-Out Works Contract For Asr Gas Facilities In Bab And Asab
Client:
ADCO
Scope Of Works:
Installation of new Bab gas producer wellheads and injector wellheads and related Tie-ins. Flowlines installation along with wellheads. Major procurement by Client.
Year of award/completion:
May 2019/Dec 2022
Current Status:
ONGOING
Project description
Call-out for BuH WHRMS and OPP (long term)
Client:
ADCO
Scope Of Works:
EPC for partial and full replacement of wellhead facilities for total 206 no of wells.
Year of award/completion:
Jan 19/Jan 22
Current Status:
ONGOING
Project description
EPC for Asab Phase - II Project, Stage-1
Client:
ADCO
Scope Of Works:
EPC for upgradation of RDS 1, RDS 2, RDS 3, RDS 4, RDS 5 & RDS 6 including relocation of related pipelines for ADNOC onshore in ASAB filed.
Year of award/completion:
Oct 18/Apr 22
Current Status:
ONGOING
Project description
EPC of Tie-In Works at South East PKG - C
Client:
ADCO
Scope Of Works:
EPC of Tie-In Works at South East Package C
Year of award/completion:
Jul 18/Jul 22
Current Status:
ONGOING
Project description
Replacement of OGD-II and OGD-0 Ageing Network in BAB Field
Client:
ADCO
Scope Of Works:
EPC for 19 no wells and 118 Kms of pipeline work for ADNOC Onshore in BAB Field
Year of award/completion:
Jun 18/Dec 20
Current Status:
COMPLETED
Project description
EPC of Natural Gas Pipeline to SENAAT Projects
Client:
SENAAT
Scope Of Works:
EPC - Construction of Natural Gas Pipelines
Year of award/completion:
May 17/Dec 17
Current Status:
COMPLETED
Project description
Inquiry No. PL.15.076 - Supply Of Sales Gas TALEX SENAAT Projects at KIZAAD
Client:
Abu Dhabi Gas Industries Ltd - GASCO
Scope Of Works:
Supply of Sales Gas TALEX SENAAT Projects at KIZAAD
Year of award/completion:
Oct 16/Dec 17
Current Status:
COMPLETED
Project description
15783.01 EPC of Tie-In Works at South East Package-A
Client:
ADCO
Scope Of Works:
EPC of Tie-In Works at South East - Asab & Sahil
Year of award/completion:
Sep 15/Apr 18
Current Status:
COMPLETED
Project description
15882.01 EPC for OGD -1 Trunk Lines Replacement and Habshan Direct Depressurization(HDD-1)
Client:
ADCO
Scope Of Works:
EPC for OGD -1 Trunk Lines Replacement and Habshan Direct Depressurization(HDD-1)
Year of award/completion:
Jul 15/Nov 17
Current Status:
COMPLETED
Project description
Interconnection of ADWEC CRS with DEL at Taweelah Project No. 5623 Enq No. 13562301 for EPC Work
Client:
Abu Dhabi Gas Industries Ltd - GASCO
Scope Of Works:
Interconnection of ADWEC CRS to DEL at Taweelah Demolition of Existing 24" Pipeline from Maqta to Taweelah
Year of award/completion:
Mar 15/Dec 16
Current Status:
COMPLETED
Project description
Tie-Ins of 5 Oil Producers at Buhasa
Client:
ADCO
Scope Of Works:
Tie-Ins of 5 Oil Producers at Buhasa
Year of award/completion:
Jan 14/Jun 14
Current Status:
COMPLETED
Project description
Site Preparation Work Package - 1 for Carbon Black & Delayed Coker
Client:
TAKREER
Scope Of Works:
Site Preparation Work Package - 1 for Carbon Black & Delayed Coker
Year of award/completion:
Oct 13/Dec 14
Current Status:
COMPLETED
Project description
24” Lean Gas Pipeline – BUHASA TO BAB AND BAB TO THAMMAMA - C
Client:
Abu Dhabi Gas Industries Ltd - GASCO
Scope Of Works:
EPC Works for Provision of New 24’’ LEAN GAS Pipeline form Buhasa to Bab and Bab to Thammama – C
Year of award/completion:
Jan 13/Dec 16
Current Status:
COMPLETED
Project description
Habshan Maqta Taweelah Pipeline Project
Client:
Abu Dhabi Gas Industries Ltd - GASCO
Scope Of Works:
EPC Works for Habshan Maqta Taweelah Pipeline Project
Year of award/completion:
Dec 12/Dec 15
Current Status:
COMPLETED
Project description
Civil Works for Well Pads SP2 and SP3
Client:
Al Hosn
Scope Of Works:
Civil Works for Well Pads SP2 and SP3
Year of award/completion:
Oct 12/Dec 13
Current Status:
COMPLETED
Project description
Berms For Interconnecting Pipelines To Borouge B3 Project
Client:
Borouge
Scope Of Works:
Berms For Interconnecting Pipelines To Borouge B3 Project
Year of award/completion:
Oct 12/Dec 13
Current Status:
COMPLETED
Project description
Construction of Perimeter Roads, Fence and installation of Communication System - SHAH
Client:
AIS
Scope Of Works:
Civil and Infrastructure
Year of award/completion:
Sep 12/Nov 13
Current Status:
COMPLETED
Project description
Gatch Bunding for Main Oil Transfer Line
Client:
ADCO
Scope Of Works:
Gatch Bunding on Callout basis
Year of award/completion:
Sep 12/Dec 15
Current Status:
COMPLETED
Project description
Supply and Installation of 10 km Perimeter Infrastructure Works to the Dabbiya Site for the DERA Programme.
Client:
AIS
Scope Of Works:
Civil and Infrastructure
Year of award/completion:
Jun 12/Aug 13
Current Status:
COMPLETED
Project description
EPC for land Preparation for Pool fire Training - Buhasa
Client:
GASCO
Scope Of Works:
Land Preparation, Construction Of Fire Training Ground, And Installation Of Fire Fighting System
Year of award/completion:
Dec 11/Feb 13
Current Status:
COMPLETED
Project description
EarthWorks For ROW Preparation, Pipeline EarthWorks For Replacement of NGL Pipeline Project
Client:
GASCO
Scope Of Works:
Pipeline Earth Works
Year of award/completion:
Nov 11/Nov 12
Current Status:
COMPLETED
Project description
Abu Dhabi Crude Oil Pipe Line Project - Habshan
Client:
IPIC
Scope Of Works:
Civil Works & Building at MPS/MP21 including Permanent Fencing
Year of award/completion:
Nov 11/Jan 13
Current Status:
COMPLETED
Project description
EarthWorks For ROW Preparation For 220 KV OHL Works for Qusahwira Field
Client:
TRANSCO
Scope Of Works:
Access Road Works
Year of award/completion:
Oct 11/Oct 12
Current Status:
COMPLETED
Project description
Site Preparation Works - Inter Refinery Pipeline - II Project
Client:
TAKREER
Scope Of Works:
Site Preparation Works
Year of award/completion:
Sep 11/Dec 12
Current Status:
COMPLETED
Project description
Hire Of Bulldozers For Onshore Rigs (three years Contract - On going)
Client:
NDC
Scope Of Works:
Hire Of Bulldozers For Onshore Rigs (three years Contract - On going)
Year of award/completion:
Aug 11/Oct 12
Current Status:
COMPLETED
Project description
Site Preparation & Land Reclamation Works for Ruwais Shopping Center Development Project
Client:
Aldar
Scope Of Works:
Land Reclamation Works
Year of award/completion:
Aug 11/Oct 12
Current Status:
COMPLETED
Project description
Maintenance of Roads in Al Ain Military Camps
Client:
Military Works Directorate
Scope Of Works:
Roads & Parking
Year of award/completion:
Aug 11/Oct 12
Current Status:
COMPLETED
Project description
Interconnection of ADCO/TRANSCO Power Network Lot - 2
Client:
TRANSCO/ADCO
Scope Of Works:
Access Road Work
Year of award/completion:
Jun 11/Aug 12
Current Status:
COMPLETED
Project description
Tank Foundations Civil & Asphalt Works, MPS - Habshan MPS / MP21 Project
Client:
IPIC
Scope Of Works:
Tank Foundations Civil & asphalt works, MPS, Habshan.
Year of award/completion:
May 11/Jul 12
Current Status:
COMPLETED
Project description
Access Road Work for 400 KV Overhead Transmission Lines From Fujairah SS to Sweihan SS Lot 1 & 2
Client:
TRANSCO
Scope Of Works:
Access Road Work
Year of award/completion:
May 11/Jul 12
Current Status:
COMPLETED
Project description
Construction & Tie-In Of Gas Injectors And Other Miscellaneous Works For ADCO and ASR Projects At Asab and Sahil
Client:
ADCO
Scope Of Works:
Civil works
Year of award/completion:
May 11/Jul 12
Current Status:
COMPLETED
Project description
Civil & Earthworks for SGD Pkg 1
Client:
Al Hosn Gas
Scope Of Works:
Civil Works for pipeline & pads
Year of award/completion:
May 11/Oct 14
Current Status:
COMPLETED
Project description
Earth Works for ROW Preparation, Pipeline Earth Works for Fujairah Phase II Water Transmission System
Client:
TRANSCO
Scope Of Works:
Earth Works for ROW Preparation, Pipeline Earth Works
Year of award/completion:
Mar 11/May 12
Current Status:
COMPLETED
Project description
Back Filling & Access Road Preparation & Gatch Supply, Farm & Land Preparation at Various Locations in Abu Dhabi & Western Region
Client:
Abu Dhabi Municipality
Scope Of Works:
Back filling & Access road preparation & Gatch supply, farm and land preparation at various locations in Abu Dhabi & Western Region Main.
Year of award/completion:
Mar 11/May 12
Current Status:
COMPLETED
Project description
Site Preparation Works - Habshan Sulphur Station
Client:
GASCO
Scope Of Works:
Site Preparation Works
Year of award/completion:
Feb 11/Apr 12
Current Status:
COMPLETED
Project description
Earth Works & Replacement of Existing Sewer Lines Works for Ruwais Housing Complex - Phase III
Client:
Adnoc
Scope Of Works:
Earth Works & Replacement of existing sewer lines works
Year of award/completion:
Feb 11/Feb 12
Current Status:
COMPLETED
Project description
Site & Infrastructure Development of Al Faqa Housing Complex
Client:
Al Ain Municipality
Scope Of Works:
Roads, Parking, Sewerage, Water supply network installation & Street Light for 100 Houses in Al Faqa
Year of award/completion:
Jan 11/Feb 12
Current Status:
COMPLETED
Project description
Site Preparation Works for BAB Gas Compression Project
Client:
ADCO
Scope Of Works:
Site Preparation Works
Year of award/completion:
Jan 11/Mar 12
Current Status:
COMPLETED
Project description
Access Road to Main Pump Station (MPS)
Client:
IPIC
Scope Of Works:
Access Road Work
Year of award/completion:
Jan 11/Mar 12
Current Status:
COMPLETED
Project description
Pipeline Civil Works & Well Head Electro-Mechanical Installation Works - Construction Work of Installation of South Buhasa Gas Lift & WAG Pilot Project
Client:
ADCO
Scope Of Works:
Pipeline Civil Works & Well Head Electro-Mechanical installation works
Year of award/completion:
Jan 11/Mar 12
Current Status:
COMPLETED
Project description
Earth Works at MPS/MP21 for Abu Dhabi Crude Oil Pipe Line Project - Habshan
Client:
IPIC
Scope Of Works:
Earth Works at MPS/MP21
Year of award/completion:
Nov 10/Apr 12
Current Status:
COMPLETED
Project description
Civil Works & FOC Cable Installation Works - EGDS Project - EPC Civil Works & FOC
Client:
Dolphin Energy Ltd.
Scope Of Works:
Civil works and FOC cable installation works
Year of award/completion:
Nov 10/Jan 12
Current Status:
COMPLETED
Project description
Maintenance of Roads in Al Ain
Client:
Public Works Dept. - Al Ain
Scope Of Works:
Roads & Parking
Year of award/completion:
Jul 98/Sep 99
Current Status:
COMPLETED
Project description
Construction & Maintenance Of Roads and Irrigation system in Zakher
Client:
Military Works Directorate
Scope Of Works:
Roads & Parking
Year of award/completion:
Feb 98/Apr 99
Current Status:
COMPLETED
Project description
Al Ain Stage-3 Development for Locals Villas
Client:
Al Ain Municipality
Scope Of Works:
Roads & Parking
Year of award/completion:
Apr 95/Jun 96
Current Status:
COMPLETED

Road Works

Project description
16274.01 - Construction of New Asphalt Road to IPS and IPS Accommodation, Sweihan
Client:
ADCO
Scope Of Works:
Construction of New Asphalt Road to IPS and IPS Accommodation, Sweihan
Year of award/completion:
May 17/Feb 18
Current Status:
COMPLETED
Project description
Miscellaneous Development Works at TAL MOREEB in Madinat LIWA
Client:
Western Region Municipality
Scope Of Works:
Miscellaneous Development Works at TAL MOREEB in Madinat LIWA
Year of award/completion:
Aug 13/Dec 14
Current Status:
COMPLETED
Project description
Link Roads from Ruwais City to New E11 & West Road
Client:
Abu Dhabi National Oil Company - ADNOC
Scope Of Works:
EPC Works for Construction of new Road along with all related facilities like Electrical lighting, Drainage etc.
Year of award/completion:
Aug 13/Oct 15
Current Status:
COMPLETED
Project description
Construction of Access Road to Proposed Rest Houses at Mahmiat Al Soqour(Stage - 1) Al-Sila
Client:
Western Region Municipality
Scope Of Works:
Construction of Access Road to Proposed Rest Houses at Mahmiat Al Soqour(Stage - 1) Al-Sila
Year of award/completion:
Jul 13/Dec 14
Current Status:
COMPLETED
Project description
Improvement & Maintenance of roads & Minor Infrastructure Facilities - LIWA
Client:
Western Region Municipality
Scope Of Works:
Maintenance of existing roads and infrastructure
Year of award/completion:
Dec 12/Apr 13
Current Status:
COMPLETED
Project description
Improvement & Maintenance of roads & Minor Infrastructure Facilities- MIRFA
Client:
Western Region Municipality
Scope Of Works:
Maintenance of existing roads and infrastructure
Year of award/completion:
Dec 12/Apr 13
Current Status:
COMPLETED
Project description
Improvement & Maintenance of roads & Minor Infrastructure Facilities - DELMA ISLAND
Client:
Western Region Municipality
Scope Of Works:
Maintenance of existing roads and infrastructure
Year of award/completion:
Nov 12/Apr 13
Current Status:
COMPLETED
Project description
Minor Roads and Parking in Al Ain Stage - 6
Client:
Al Ain Municipality
Scope Of Works:
Roads and Parking
Year of award/completion:
Dec 11/Mar 13
Current Status:
COMPLETED
Project description
Al Ain Stage-3 Development
Client:
Al Ain Municipality
Scope Of Works:
Roads & Parking
Year of award/completion:
Nov 11/May 12
Current Status:
COMPLETED
Project description
Minor Roads and Parking in Al Ain Stage-3
Client:
Al Ain Municipality
Scope Of Works:
Roads and Parking and Fencing Works
Year of award/completion:
Oct 11/Feb 13
Current Status:
COMPLETED
Project description
Al Ain Stage-5 Development
Client:
Al Ain Municipality
Scope Of Works:
Roads & Parking
Year of award/completion:
Oct 11/Jul 12
Current Status:
COMPLETED
Project description
Roads & Parking for Incinerator in Al Ain
Client:
Al Ain Municipality
Scope Of Works:
Roads & Parking
Year of award/completion:
Aug 11/Feb 12
Current Status:
COMPLETED
Project description
Al Ain Stage-2 Development
Client:
Al Ain Municipality
Scope Of Works:
Roads & Parking
Year of award/completion:
Sep 97/Jul 98
Current Status:
COMPLETED
Project description
Al Ain Stage-4 Development
Client:
Al Ain Municipality
Scope Of Works:
Roads & Parking
Year of award/completion:
Nov 96/May 97
Current Status:
COMPLETED

Infrastructure Works

Project description
Early Works Site Preparation For Borouge 4
Client:
Borouge
Scope Of Works:
Earthworks, Roads, Solar Street lighting, Fence, CICPA
Year of award/completion:
Jul 21/Sep 22
Current Status:
ONGOING
Project description
Civil Works & Steel Structure Erection of IGD-E Project Phase-I
Client:
GASCO
Scope Of Works:
Civil Works and Steel Structure Erection at GASCO's Habshan 5 Plant
Year of award/completion:
Dec 15/Aug 17
Current Status:
COMPLETED
Project description
RaSN-ISBL Earthworks, Cluster Earthworks, Earthworks For Network & Export Pipelines
Client:
ADCO
Scope Of Works:
Earth works for CPP, ISBL, Clusters, Network Pipeline & Export Pipeline at NEB Rumaitha
Year of award/completion:
Jan 15/Apr 17
Current Status:
COMPLETED
Project description
Site Preparation Works for NEB Phase III Project
Client:
ADCO
Scope Of Works:
"Site preparation works for ISBL area Rumaitha Shanayel Phase 3 Project"
Year of award/completion:
Nov 14/Oct 15
Current Status:
COMPLETED
Project description
T# P167-T-BPS-077-14 Design and Build for Enabling Work of Residential Complex for Al Ruwais
Client:
MUSANADA
Scope Of Works:
Design & Build, Ground Improvement works for the residential buildings
Year of award/completion:
Nov 14/Dec 15
Current Status:
COMPLETED
Project description
SHAH Site SRB Supply & Installation
Client:
CNIA / CICPA
Scope Of Works:
Supply & Installation Of Jersey Barrier, Traffic Signs, Solar Lightings, And CICPA Warning Signs
Year of award/completion:
Aug 14/Dec 14
Current Status:
COMPLETED
Project description
Interlock Paving Works - SHAH
Client:
AL HOSN GAS
Scope Of Works:
Interlock Paving Works
Year of award/completion:
Jan 14/Aug 14
Current Status:
COMPLETED
Project description
Slope Protection Package - 5
Client:
TAKREER
Scope Of Works:
Slope Protection Package - 5
Year of award/completion:
Dec 13/Mar 14
Current Status:
COMPLETED
Project description
Fence & Gate Installation and Gatch Paving Works
Client:
TAKREER
Scope Of Works:
Fence & Gate Installation and Gatch Paving Works
Year of award/completion:
Sep 13/Aug 14
Current Status:
COMPLETED

Civil & Building Works

Project description
Construction of Compressor Foundations Works for Spiking Gas Compressor at Shah
Client:
ADCO
Scope Of Works:
Construction of Compressor Foundations Works for Spiking Gas Compressor
Year of award/completion:
Aug 12/Dec 12
Current Status:
COMPLETED
Project description
Construction of Masjid at Madinat Zayed
Client:
Saeed Al Mazrouei
Scope Of Works:
EPC of Masjid construction as per the standards of AWQAF
Year of award/completion:
Feb 14/Aug 14
Current Status:
COMPLETED
Project description
EPC Site Preparation & Earth Moving Works for Borouge - 3
Client:
Abu Dhabi Polymers Co. Ltd (Borouge)
Scope Of Works:
EPC Works For Site Preparation, Temporary Office Facilities, CNIA facilities, Access Control & Permanent fencing works
Year of award/completion:
Oct 10/Dec 11
Current Status:
COMPLETED
Project description
Civil Works of Section MP21, MPS, KP 38 - Abu Dhabi Crude Oil Pipe Line Project - Habshan
Client:
IPIC
Scope Of Works:
Civil Works of Section MP21, MPS, KP 38
Year of award/completion:
Oct 10/Jan 12
Current Status:
COMPLETED
Project description
6 Villas for Mr. Saeed Al Mazrouei
Client:
Saeed AL Mazrouei
Scope Of Works:
EPC of 6 Residential Buildings
Year of award/completion:
Jun 09/Apr 10
Current Status:
COMPLETED

Overseas Project

Project description
Gelemso – Mechara - Micheta Road Upgrading Project; Contract 2: Gelemso-Mechara-Micheta (45.9km)
Client:
Ethiopian Road Authority - ERA
Scope Of Works:
Upgradation of existing gravel roads to two lanes of asphalt and four lanes in city areas
Year of award/completion:
Apr 15/May 20
Current Status:
COMPLETED
Project description
Arbereketi – Gelemso – Mechara - Micheta Road Upgrading Project; Contract 1 : Arbereketi to Gelemso (57.5km)
Client:
Ethiopian Road Authority - ERA
Scope Of Works:
Upgradation of existing gravel roads to two lanes of asphalt and four lanes in city areas
Year of award/completion:
Mar 15/Mar 20
Current Status:
COMPLETED
Project description
CULVERTS OVER EXISTING PIPELINE
Client:
SOUTH OIL COMPANY - IRAQ
Scope Of Works:
CIVIL WORKS
Year of award/completion:
Mar 14/Dec 15
Current Status:
COMPLETED
Project description
EPC OF ROAD BETWEEN ZUBAIR SAFWAN FIELD UP TO KUWAIT BORDER(6 LINE - 26 KM)
Client:
BASRA GOVERNORATE - IRAQ
Scope Of Works:
ROAD, GENERAL CIVIL WORKS, ELECTRICAL WORKS
Year of award/completion:
Mar 13/Dec 15
Current Status:
COMPLETED